DCVero
Post-Construction Cleaning in Berlin by DCVero Dienstleistungen
POST-CONSTRUCTION CLEANING BERLIN

Post-Construction Cleaning in Berlin

Thorough post-construction cleaning in Berlin after renovation, drywall, paint or full fit-out. We remove fine dust, paint splatter and construction debris so the space is safe, breathable and ready for occupancy.

Fine Dust Removal

Construction dust settles everywhere. We HEPA-vacuum every surface, including ducts, fixtures and behind radiators.

Multi-Stage Process

Rough clean, detail clean, polish clean. Three passes so paint splatter, adhesive residue and overspray are all removed.

Insured and Safe

Full business liability insurance and trained crews who know how to work safely around fresh finishes.

Ready for Handover

Floors polished, windows streak-free, sanitary fixtures de-stickered. The space looks ready for photos.

WHAT'S INCLUDED

Everything that's covered.

  • HEPA vacuuming of every surface, edge and duct
  • Removal of stickers, labels and protective films
  • Paint and adhesive splatter removed from floors and fixtures
  • Windows polished inside and out
  • Sanitary fittings, taps and tiles polished
  • Final detail walkthrough with foreman
HOW IT WORKS

From quote to spotless.

  1. 01

    Site Inspection

    We visit the Berlin site after trades have finished, assess scope and propose a multi-stage clean. Quote within 24 hours.

  2. 02

    Phased Cleaning

    Rough → detail → polish. Each stage with the right tools and crew size for your timeline. Coordinated with handover dates.

  3. 03

    Handover Walkthrough

    We walk the property with you or your foreman, log any remaining items and confirm sign-off.

FAQ

Frequently Asked Questions

Do you handle large commercial fit-outs?+

Yes — we regularly clean post-construction across Berlin from single apartment renovations to multi-floor commercial fit-outs.

Can you start before all trades are finished?+

We can run rough cleans in parallel with finishing trades, then a detail and polish pass at handover. Coordinate with your project manager.

Do you remove construction waste?+

We remove cleaning-stage debris (dust bags, packaging). Larger demolition or trade waste should be cleared by the contractor before we start.

How fast can you mobilise?+

Standard mobilisation is 2–5 business days. Urgent jobs can sometimes start within 24 hours in Berlin — call us to confirm.

FREE QUOTE

Post-Construction Cleaning in Berlin

Multi-stage clean for new builds and renovations. Insured, scheduled around your handover.